For contractors

For contractors: from material request to cost control.

Switch on the contractor modules and Datumly runs your sites too: material requests from site, stock per site, equipment and fuel, procurement and cost control — next to the projects, site diary, drawings, quality and running bills.

From site to cost sheet

One cement order, from request to cost control.

Follow a material request across a contractor's week — the site, the store, purchase, and the owner's cost sheet.

01

Site engineer · Bhaisepati site

The site asks — from a phone

Saturday's pour needs 200 bags of OPC cement. The site engineer raises a material request from her phone — items, quantity, needed-by date, a photo — and it goes to head office for approval in the inbox.

In Datumly: Material requests

02

Store keeper · head office

The store sends what it has — and the ledger knows

Approved. The store has 120 bags, so it sends a part delivery with the challan and vehicle number. The site marks it received, two bags damaged. Stock moves line by line through the ledger, never goes negative, and anything under its minimum shows on Today.

In Datumly: Stock per site · Transfers

03

Purchase officer

Three quotations side by side, one purchase order

For the other 80 bags, three suppliers quote. Datumly marks the lowest rate per item; the purchase order is approved in the inbox and numbered on approval. The supplier's bill, the payment and payables ageing follow.

In Datumly: Quotations · Purchase orders

04

Owner

Budget vs actual, before the year-end surprise

Cement used on site is costed at moving average and booked against the BOQ item. Materials are now at 104% of budget: the overrun alert went off at 100%, and the project shows under “Projects over budget”.

In Datumly: Cost control

Datumly project Cost tab for a sample contractor project: budget Rs 19,40,000, actual cost to date, materials over budget at 104%, and bars by cost head for materials, labour, equipment and fuel, subcontract and overheads.
Sample data Cost control — budget vs actual by cost head and BOQ item.

Contractor modules — available

  • Materials

    Available

    Site request → head-office approval → sent → received at site, or rejected / transferred. Part deliveries, short and damaged noted, challan and vehicle numbers in the history.

  • Stock

    Available

    Head-office store and per-site stock from an append-only ledger — never negative. Daily consumption against BOQ items, minimum levels on Today.

  • Equipment & fuel

    Available

    Owned or hired machines, daily fuel, hours and meter readings; hire cost added to the project.

  • Procurement

    Available

    Suppliers, quotations side by side, purchase orders approved in the inbox, supplier bills and payables ageing.

  • Subcontractor bills

    Available

    Against BOQ items or measured quantity, with optional retention.

  • Cost control

    Available

    Budget vs actual by cost head and BOQ item, with overrun alerts and a "Projects over budget" figure.

  • Store keeper and Purchase officer roles

    Available

    Ready-made roles; or build your own from the permissions.

  • Supplier and subcontractor login

    Available

    Your suppliers quote, acknowledge POs, send delivery notes and bills on their own portal. Nothing they send moves stock or money until your team accepts it; bank-detail changes are confirmed before you pay.

  • Returns, debit notes and retention release

    Available

    Return goods against a receipt with a debit note; release retention at practical completion and after the defects liability period.

  • Approve less, FIFO, machine maintenance

    Available

    Cut a request line by line with a reason; FIFO or moving-average valuation; service plans and breakdowns on Today.

Works for contractors today

  • Projects and phases

    Available

    Clients, sites, phases with weighted progress, the team on each project.

  • Site diary

    Available

    Crew, weather, work done, materials and photos, approved before the client sees them.

  • Drawing register

    Available

    Revisions with approval, one current approved revision per drawing, transmittals of what went to whom.

  • Quality

    Available

    Stage inspections, cube / slump / rebar tests, and a defect list with owners and due dates.

  • BOQ and running bills

    Available

    BOQ versions, measurements per item, running bills from measured quantities × approved rates.

  • Timesheets and expenses

    Available

    Hours per project, expenses with receipts, approved in the inbox.

Coming soon

  • Site phone app

    Coming soon

    Offline first — material requests and daily reports from the site in one tap.

  • VAT input credit and TDS on supplier payments

    Coming soon

    Being worked out with accountants — enter VAT as it appears on the bill for now.

Modules are switched on per firm. A contractor sees materials and fuel; it never has to see the permit tracker unless it wants it.

Running a contractor business? Book a demo and we'll walk you through your own sites.

Contact

See your own projects in Datumly.

Start with one project, invite the people who work on it, and give each of them their roles. Everything else can follow.